Bridge in Myanmar
2006-4-10

      The Rangon ¨C Tinyin Bridge is a road ¨C railway bridge with the length of railway 2,938.5 meters and road 2,151.3 meters.

      The total value of the contract is 193,270,000 Yuan RMB and the construction period 72 months.

      This bridge was opened to traffic on July 31,1993.

 

 

 

¡¾Close¡¿