Project Name : Rehabilitation and Renewal of Botswana Railway
Employer : Botswana Railway Department
Project Location : 2 sections from Serule to Mahalapye and from Mahalapye to Artesia
Signature time: September 1996
Construction period : 3 years
Value of contract : USD 40,556,700
The main work of this project:
1) Rehabilitate and renew the railway of 261 km in total length.
2) Replace the existing rail on the main line with 50Kg/m continuous welded new rail.
3) Replace the existing sleepers on the main line with the pre-stressed concrete new sleepers.
4) Replace the existing turnouts on the main line with the 50Kg/m turnouts.
5) Add appropriate quantity of ballast as per design.